I have known Parker Brown since the late ‘90s and I love working with them.   Their sense of urgency, dedication, and “client comes first” attitude is greatly appreciated. Most of all, I trust them."

Tom Dwyer – CBRE, Sr. Vice President

Goleta

Parker Brown, Inc., recently completed a tenant improvement project for a Client at its Medical Office Building in Goleta, California. The scope included a full buildout of the second floor and a partial buildout of the first floor within the existing two-story facility.

Parker Brown originally delivered the ground-up shell construction of this medical office building in 2022, and was pleased to return to support the next phase of its evolution.

The first floor was designed to support a wellness program and includes classroom and conference space, consultant offices, and staff support areas. The second floor houses a new primary care clinic, featuring 26 exam rooms, consultation rooms, offices, and medical assistant workspaces.

The interior reflects a high level of finish and attention to detail, with custom wood finishes throughout the second-floor waiting and reception areas, as well as curved wood features at the MA stations. The result is a warm, functional clinical environment that supports both patients and care teams.

Architect: Boulder Associates, Inc.
Client: Goleta Valley Professional Buildings, Inc.
Size: 11,797 SF (First Floor: 2,146 SF | Second Floor: 9,651 SF)